---
title: OTP LDTD TETHER CINCH
duration: 15



# Below containst the task and steps within the checklist
steps:
    # First steps in IV/SSRMS column (first column)
    - IV/SSRMS:
      - step: "Tools Required:"
        checkboxes:
          - 1 Long Wire Tie

    # Steps in EV column (second column)
    - EV:
      - caution: Avoid inadvertent contact with the OTP and RPCM radiator panel on Face 3

    # Continue steps in IV/SSRMS column (first column)
    - IV/SSRMS:
      - step: Inhibits Required: None

    # Continue steps in EV column (second column)
    - EV:
      - title: OTP LDTD TETHER CINCH
        time: 00:15
      - step: Translate to OTP
        checkboxes:
          - Use HR stanchion for local tether
      - step: Route wire tie under buckle
      - step: Cinch down the LDTD Tether
      - step: Close the MLI over the buckle
        checkboxes:
          - "checkmark: No metal showing"
      - step: Install wire tie around MLI, closer to buckle end
        checkboxes:
          - 3 twists
      - step: If possible, wrap wire tie under and around MLI a second time
        checkboxes:
          - 3 twists
      - step: Gather excess tether on top of MLI
        checkboxes:
          - Close tabs
      - step: Glove Check