title: OTP LDTD TETHER CINCH
duration: 15



# Below containst the task and steps within the checklist
steps:
    - simo:
        # First steps in IV/SSRMS column (first column)
        IV/SSRMS:
          - step: "Tools Required:"
            checkboxes:
              - 1 Long Wire Tie

        # Steps in EV column (second column)
        EV:
          - caution: Avoid inadvertent contact with the OTP and RPCM radiator panel on Face 3
    - simo:
        # Continue steps in IV/SSRMS column (first column)
        IV/SSRMS:
          - step: Inhibits Required: None

        # Continue steps in EV column (second column)
        EV:
          - title: OTP LDTD TETHER CINCH
            time: 00:15
          - step: Translate to OTP
            checkboxes:
              - Use HR stanchion for local tether
          - step: Route wire tie under buckle
          - step: Cinch down the LDTD Tether
          - step: Close the MLI over the buckle
            checkboxes:
              - "checkmark: No metal showing"
          - step: Install wire tie around MLI, closer to buckle end
            checkboxes:
              - 3 twists
          - step: If possible, wrap wire tie under and around MLI a second time
            checkboxes:
              - 3 twists
          - step: Gather excess tether on top of MLI
            checkboxes:
              - Close tabs
          - step: Glove Check